Client
Keolis Amey & Alun
Griffiths
Project overview
BB7 were appointed for Fire and Security engineering on the The South Wales Metro project which involved the development of an integrated public transport network and a £100m metro depot. BB7 provided RIBA stage 2 and 3 fire engineering support and security strategic design services for both the CVLICC Control Centre for the Core Valley Railway system, as well as the associated Depot facility at Taff’s Well on behalf of Keolis Amey.
Project Scope
The South Wales Metro (Metro De Cymru) is an integrated heavy rail, light rail, and bus-based public transport services and systems network in South East Wales, around the hub of Cardiff Central. The project includes a brand-new metro depot at Taff’s Well, new trains, the electrification of the Core Valley Lines, new stations, and many other exciting new developments.